Execution: 2009
Contractor: Técnicas Reunidas, S.A.
Client: Gas Natural
THE COMMISSIONING OF THIS FUNDAMENTAL INFRASTRUCTURE FOR CATALONIA, AND SPECIFICALLY FOR THE AREA OF BARCELONA, COUNTED WITH MMYPEM.
The regasification plant at the port of Barcelona is one of the most important of the State and constitutes an input node of natural gas to the peninsula. In recent years, several expansions have been carried out to reach its current storage capacity (840,000 m3 LNG), emission (1,950,000 Nm3 / h of GN) and docking (263,000 m3 LNG).
The distribution network (high, medium and low pressure) is promoted, built and operated by several distributors, including Gas Natural.
Source: AYTO. BARCELONA